Operational resilience under the UK rules: important business services and impact tolerances after the 2025 deadline
In brief
How PRA SS1/21 and FCA PS21/3 define important business services and impact tolerances, what changed in 2026, and a worked example of setting one tolerance.
Steve Elliott · · 7 min read
On this page
- What do the PRA and FCA rules require, and by when?
- How is an impact tolerance different from an RTO or a risk appetite?
- What does setting one tolerance look like in practice?
- Why is this a portfolio and investment question, not a BCP refresh?
- What has changed since the deadline?
- How does the UK approach compare with Basel and DORA?
- Sources
An important business service is a service a firm provides to people outside it whose disruption could cause intolerable harm to consumers or threaten the firm's soundness or the financial system. An impact tolerance is the most disruption that service can absorb, always including a time limit, and since March 31, 2025 UK banks, insurers and other in-scope firms have had to be able to stay within it in severe but plausible scenarios.
That deadline changed the question boards answer. Before it, the work was identifying services, setting tolerances and building the mapping and testing. After it, in our view, most gaps between a tolerance and what testing shows are spending decisions, and they belong in the investment portfolio rather than in a refreshed business continuity plan.
What do the PRA and FCA rules require, and by when?
The regime sits in the Prudential Regulation Authority's supervisory statement SS1/21 and the Financial Conduct Authority's policy statement PS21/3, both first published March 29, 2021, with rules in force from March 31, 2022. The PRA's current SS1/21 is the March 2022 version. As of November 2026:
| PRA (SS1/21) | FCA (PS21/3) | |
|---|---|---|
| Firms | UK banks, building societies, PRA-designated investment firms, UK Solvency II firms, Lloyd's and its managing agents | Those firms plus recognised investment exchanges, enhanced-scope SM&CR firms, payment and e-money institutions and others listed on the FCA's page |
| Harm test | Safety and soundness, policyholder protection (insurers), UK financial stability | Intolerable harm to consumers; risk to market integrity or to the UK financial system |
| Tolerance metric | Must include a time-based metric (para 3.6) | Time or duration is mandatory |
| By March 31, 2022 | Identify services, set tolerances, map, and begin scenario testing (paras 4.12–4.13) | Identify services, set tolerances, map, test and identify vulnerabilities |
| Remain within tolerance | No later than March 31, 2025 (para 4.14) | As soon as reasonably practicable, no later than March 31, 2025 |
PS21/3 describes intolerable harm as harm from which consumers cannot easily recover. Dual-regulated firms set up to two tolerances per service, one for each regulator's test, and may add sub-tolerances.
The core cycle is the same for both regulators:
- Identify a relatively short list of external-facing services (SS1/21 para 2.3), reviewed at least annually or after significant change (para 2.10).
- Set a tolerance for each, at the point beyond which further disruption would breach the harm test (para 3.2).
- Map the people, processes, technology, facilities and information each service needs (para 5.1), updated at least annually (para 5.9).
- Test whether the firm can stay within tolerance in severe but plausible scenarios (para 6.1), including failure at a third party or its supply chain (para 6.13).
- Remediate vulnerabilities, and record all of it in a self-assessment the board approves (paras 7.1, 8.1 and 8.3).
How is an impact tolerance different from an RTO or a risk appetite?
An impact tolerance is set from the outside in: how long can customers or markets go without this service before the harm is intolerable. A recovery time objective is set from the inside out, for one system or resource. SS1/21 lists recovery time and recovery point objectives among the resource requirements a firm sets so it can deliver within its tolerance (para 3.14). The FCA's May 2024 observations note that it is common to see RTOs set well within impact tolerances, because backlogs still need processing once systems recover.
A tolerance also assumes the disruption happens. SS1/21 says tolerances concern the impact of a single disruption, not how often disruptions occur (para 3.13). A risk appetite weighs likelihood; an impact tolerance does not. That is why a likelihood-weighted risk assessment cannot set a tolerance, while a business impact analysis, which measures harm over time, is a natural input.
The PRA accepts that some firms may not stay within tolerance if essential infrastructure such as power, transport or telecommunications is unavailable (para 6.10), and it wants firms to test some scenarios they expect to fail, with the board judging whether a breach there is acceptable (para 6.12). The FCA's 2024 observations favor simulations and failover tests over desk exercises, raising severity until the firm can no longer stay within tolerance.
What does setting one tolerance look like in practice?
Take an illustrative UK retail bank. Every number in this section is invented for illustration. The service is "retail customers making payments from a current account," used by 600,000 customers.
Set the tolerance. A few hours without payments is an inconvenience. By the end of the next day, customers start missing rent, bills and essential purchases, and vulnerable customers are hit first. The board sets the tolerance at 24 hours, with a second metric: no more than 50,000 customers unable to pay for more than 12 hours. The FCA's observations suggest adding metrics such as customer types or transaction values.
Map and test. The test scenario is a two-day loss of the hosting region of the bank's third-party fraud-screening service, a severe but plausible case of the kind para 6.13 describes.
| Dependency | Recovery time shown in testing | Within 24 hours? |
|---|---|---|
| Mobile and online banking front end | 4 hours | Yes |
| Payments gateway | 6 hours | Yes |
| Core banking ledger | 8 hours | Yes |
| Fraud screening (third-party, single region) | 36 hours | No |
| Contact center for vulnerable customers | 12 hours | Yes |
Without screening, the bank halts outbound payments, so the service breaches tolerance by 12 hours.
Price the options. Over three years:
- Option A, second region from the vendor. £900,000 one-off plus £350,000 a year: 0.9 + (3 × 0.35) = £1.95 million. Recovery in 4 hours.
- Option B, pre-approved degraded mode. In-house rules-based screening with lower payment limits: £400,000 plus £60,000 a year: 0.4 + (3 × 0.06) = £0.58 million. Recovery in 10 hours, with high-value payments restricted; testing shows about 8,000 customers affected by the limits, inside the second metric.
- Option C, accept the breach. In our reading, not available here: the scenario is severe but plausible, so since March 31, 2025 the bank must be able to stay within tolerance.
Both A and B bring the service within 24 hours. B costs about 30% of A but leaves a 14-hour margin and degrades service; A leaves 20 hours and costs £1.37 million more. That is an investment choice with a regulatory acceptance criterion, competing with every other demand on the change budget.
Why is this a portfolio and investment question, not a BCP refresh?
In our view, the texts point that way. SS1/21 says impact tolerances provide a standard boards and senior management should use for prioritising investment (para 3.4), and its own worked illustration has a firm increase investment in its systems to get within tolerance (para 4.11). PS21/3 tied the 2025 deadline to completing mapping and testing and making the necessary investments.
The PRA's January 15, 2026 priorities letter to UK deposit takers pushes the same way. It asks boards to treat resilience as part of decision-making, including how new products, IT upgrades and outsourcing affect it, and to improve their resilience testing.
A continuity plan describes how to respond to a disruption. A tolerance gap says the current architecture cannot deliver an outcome the board committed to. We think closing it needs the same things any investment needs: an owner, a cost, a funding decision, a delivery date and a retest that proves the gap closed. For rehearsing the human side of these scenarios, see our tabletop exercise guide.
What has changed since the deadline?
As of November 2026:
- Critical third parties. On July 10, 2026, the Bank of England announced that HM Treasury had designated four cloud and technology providers as critical third parties: Amazon Web Services EMEA SARL, Google Cloud EMEA Limited, Microsoft Ireland Operations Ltd and Oracle Corporation UK Limited. Joint oversight began July 13, 2026.
- Incident and third-party reporting. The PRA's PS7/26 and the FCA's PS26/2, both published March 18, 2026, take effect March 18, 2027. For PRA firms, initial incident reports are expected within 24 hours of determining a threshold is met, with a final report within 30 working days of resolution. Firms must also notify material third-party arrangements and submit an annual register.
- Cyber. On November 19, 2026, the PRA, the Bank and the FCA published CP17/26 and GC26/9 on cyber risk and resilience management. It proposes no new rules; a draft supervisory statement and guidance explain how existing requirements, including operational resilience and third-party rules, apply to cyber. Comments close February 26, 2027.
The FCA's 2024 observations were blunt on third parties: "the failure to remain within impact tolerance is your responsibility." In our view, designation would not change the bank's decision in the example above. See third-party risk management for the broader discipline.
How does the UK approach compare with Basel and DORA?
The Basel Committee's Principles for Operational Resilience, published March 31, 2021, define operational resilience as "the ability of a bank to deliver critical operations through disruption." They set seven principles, from governance to ICT and cyber security, and a tolerance for disruption that the board sets with severe but plausible scenarios in mind.
DORA, Regulation (EU) 2022/2554, has applied since January 17, 2025 (Article 64). It is organized around ICT risk and "critical or important functions" (Article 3(22)). Its resilience strategy must analyse the impact tolerance for ICT disruptions (Article 6(8)(b)), ICT continuity plans must be tested at least yearly (Article 11(6)), and financial entities identified for it run threat-led penetration testing at least every three years (Article 26(1)). The UK regime covers all causes of disruption to a service, not only ICT. See DORA vs NIS2.
| UK (PRA/FCA) | Basel principles | DORA | |
|---|---|---|---|
| Unit | Important business service | Critical operations | Critical or important functions |
| Limit | Impact tolerance, time metric mandatory | Tolerance for disruption | Impact tolerance for ICT disruptions |
| Status | Binding rules; remain-within date passed March 31, 2025 | Non-binding principles; take effect through national supervisors' rules | EU regulation, applies since January 17, 2025 |
This post describes the UK rules and related texts and is not legal or regulatory advice. Confirm how they apply to your firm with counsel or your supervisor.
Sources
- Bank of England, PRA, SS1/21 Operational resilience: Impact tolerances for important business services, first published March 29, 2021; current version March 2022 (PDF)
- FCA, PS21/3 Building operational resilience, March 29, 2021, updated March 31, 2022 (PDF)
- FCA, Operational resilience, last updated September 15, 2026
- FCA, Operational resilience: insights and observations for firms, May 28, 2024
- Bank of England, PRA, PS7/26 Operational resilience: Operational incident and third-party reporting, March 18, 2026
- FCA, PS26/2 Operational incident and third party reporting, March 18, 2026
- Bank of England, UK financial regulators to begin overseeing critical third parties announced by HMT, July 10, 2026
- Bank of England, PRA, UK deposit takers: 2026 priorities, January 15, 2026
- Bank of England, PRA and FCA, CP17/26 and GC26/9 Cyber risk and resilience management, November 19, 2026, consultation closes February 26, 2027
- Basel Committee on Banking Supervision, Charter, paras 3 and 5
- Basel Committee on Banking Supervision, Principles for operational resilience, March 31, 2021 (PDF)
- European Union, Regulation (EU) 2022/2554 (Digital Operational Resilience Act), OJ L 333, December 27, 2022 (Articles 3, 6, 11, 26, 64)
Frequently asked questions
Did the March 31, 2025 deadline end UK operational resilience work?
No. It ended the transition period. Since then, in-scope firms must be able to remain within impact tolerances in severe but plausible scenarios. Services and mapping still need review at least annually, testing continues, and the board keeps approving the self-assessment. The PRA's January 2026 priorities letter asks deposit takers to improve testing, and new incident and third-party reporting rules apply from March 18, 2027.
How many impact tolerances does a dual-regulated firm set?
Up to two per important business service. PS21/3 says dual-regulated firms set up to two tolerances, reflecting the different statutory objectives: the FCA's test centers on intolerable harm to consumers and market integrity, the PRA's on safety and soundness, policyholder protection and financial stability. Firms may add sub-tolerances if they find them useful. Each tolerance must include a time-based metric.
Is an impact tolerance the same as a recovery time objective?
No. An impact tolerance is the maximum tolerable disruption to a service, set from the harm to customers, the firm or markets. A recovery time objective applies to a system or resource and is set so the service can recover within its tolerance. The FCA's 2024 observations note RTOs are commonly set well within impact tolerances, since processing backlogs still has to happen after recovery.
Does the UK critical third parties regime reduce a firm's own obligations?
No. The Bank of England said in July 2026 that the regime complements, but does not replace, existing outsourcing and operational resilience rules. Firms remain responsible for due diligence, risk management and contingency planning for their third-party arrangements. The FCA's 2024 observations were explicit that a failure to remain within impact tolerance is the firm's responsibility, including where a third party causes it.
Steve Elliott
Published November 23, 2026
More on Risk, Compliance & Controls
SOX, DORA, control mapping.
Keep reading
IT cost transparency in financial services: why resilience rules change the model
Banks, payment firms and insurers must map technology and suppliers to critical services. Why that changes IT cost transparency, and how a TBM model helps.
Why Is Positioning Important in Marketing: Key Benefits Explained
Positioning matters because it decides how buyers see you against the alternatives. Clear positioning sharpens messaging, supports pricing and makes a brand easier to remember.
What GRC software actually does, and what it can't fix
What GRC software covers, from risk registers to audit workflow, what it can't fix, and the signals that a spreadsheet risk and control program has run out.
Three lines of defense vs the IIA's Three Lines Model: what changed from 2013 to 2026
How the IIA's Three Lines Model moved from the 2013 lines of defense to the July 2026 Statement of Position, why bank rules keep old terms, and what to fix.