Cost takeout that sticks: why removed cost creeps back, and how to track it

In brief

Removed cost returns via backfill, contractors, shifted lines and deferred spend. How to set the baseline, remove the budget and track net cost for 24 months.

Steve Elliott

Steve Elliott · · 7 min read


On this page
  1. Why does removed cost creep back?
  2. What does the research say about downsizing that pays off?
  3. What baseline should a takeout be measured against?
  4. Why remove the budget, not just the spend?
  5. Which controls stop backfill and substitution?
  6. What does a 24-month tracker look like?
  7. Who should own the number after the program ends?
  8. Sources

Removed cost tends to creep back when the work, the budget and the controls stay where they were. Roles are backfilled under new titles, the same work reappears as contractor or consulting spend, costs move to another cost center, and spend that was deferred comes due.

In our view, a cost takeout sticks when three things are true: the budget is removed, not just the spend; the whole cost base is tracked against a fixed baseline, including contingent labor and cross-charges; and tracking runs for 24 months, well past the point at which a program might close.

Why does removed cost creep back?

We count five mechanisms. Each moves cost rather than removing it, so a tracker that watches only the line that was cut will miss it.

  • Backfill. A role is eliminated, and a similar role is created a few months later in another team or at another grade.
  • Substitution. The work is still needed, so it returns as contractors, temporary staff or consultants, often at a higher unit cost.
  • Shifting. Cost moves to another cost center, a new allocation, a customer or a later budget year.
  • Deferral. Maintenance, renewals and upgrades are pushed out. They come back later, as the NAO cases below show.
  • Volume rebound. When activity grows again, the cost base grows with it. Anderson, Banker and Janakiraman's 2003 study of 7,629 firms over 20 years found SG&A costs rose about 0.55% for each 1% rise in sales but fell only about 0.35% for each 1% fall. In our view, costs that on average fall reluctantly and rise readily can refill slack a program leaves when volume returns.

The UK National Audit Office has documented examples of the first four. Its 2016 report on consultants and temporary staff found that the main 17 departments cut that spending by around £1.5 billion a year between 2009-10 and 2014-15. But annual spending rose by £400 million to £600 million after 2011-12, while departments were reducing their permanent workforce, which the NAO said suggested the fall "was more of a short-term reduction than a sustainable strategy." It warned that managers may use higher-cost temporary resources to bypass recruitment controls, and its analysis suggested specialist temporary staff were generally paid twice as much as their nearest permanent equivalent.

The NAO's 2021 lessons report, Efficiency in government, draws on earlier audits for the other mechanisms. The Ministry of Justice's prison unit cost programme broadly delivered its planned staff reductions and savings by 2016; from 2017 the government sought to increase prison staff numbers. After HMRC cut personal tax staff from 26,000 to 15,000 between 2010-11 and 2014-15, demand for telephone advice did not fall as expected, and back-office staff had to be moved to its call centres. Civil legal aid reforms produced more litigants in person, which the NAO estimated added £3 million a year to court costs. Funding meant for NHS capital projects was moved into day-to-day running costs. The report warns that a short-term focus can push departments toward efficiency gains that "inadvertently store up additional costs for later."

What does the research say about downsizing that pays off?

Most peer-reviewed work measures firm performance after downsizing, not whether cost came back. It is still the closest evidence. In our reading, it points one way: headcount cuts on their own rarely improve performance, while cuts made with wider restructuring fare better.

  • Cascio, Young and Morris (1997), Academy of Management Journal, studied 5,479 employment changes in S&P 500 companies from 1980 to 1994. Firms that only cut employees did not show significantly better return on assets or stock returns than their industry peers. Firms that combined workforce cuts with asset restructuring did.
  • Love and Nohria (2005), Strategic Management Journal, studied the 100 largest US industrial firms from 1977 to 1993. Treating downsizing as an attempt to reduce slack, they found it more likely to improve performance when firms had high slack, when it was broad, involving organizational redesign rather than narrow personnel cuts, and when it was proactive rather than a reaction to decline.
  • Guthrie and Datta (2008), Organization Science, used matched data on US manufacturing firms and found downsizing associated with lower subsequent profitability, after controlling for prior performance. The effect was worse in R&D-intensive, high-growth and low-capital-intensity industries.

We read these together as an argument about mechanism. If the work stays the same, the need for people to do it stays the same, and cost finds its way back through backfill or substitution. That is our inference, not a finding of these studies.

What baseline should a takeout be measured against?

A fixed one, agreed with finance before the first action, covering the whole addressable cost base. US defense efficiency programs show what happens otherwise. In July 2017 GAO found that the Department of Defense's own assessment called $5.3 billion of claimed headquarters savings "not auditable," partly because the baseline for reductions had not been established (GAO-17-724). In 2012 GAO had found that DOD's instruction on headquarters data did not address tracking contractors who perform headquarters-type functions (GAO-12-345).

In our view, a baseline that holds up has five parts:

  1. Scope by cost line, not by initiative. Employee cost, contractors, temporary staff, consultants, outsourced services, software and cross-charges for the units in scope.
  2. A fixed period. We suggest the last full year's actuals, with one-offs removed and listed.
  3. Headcount and positions. Both people and approved positions, so a vacancy can't be refilled quietly.
  4. Volume drivers agreed up front. If the business grows, the baseline adjusts by an agreed driver, shown as its own line, never netted against savings.
  5. A link to the ledger. Every saving maps to a general ledger account and cost center, so finance can reconcile it.

Why remove the budget, not just the spend?

Because, in our view, unspent budget tends to get spent. A unit that cuts $2 million of cost but keeps its budget shows a favorable budget variance for a year, and nothing stops the money funding something else by the next planning cycle. We count a saving as banked only when the budget for that line has been cut by the same amount, the reduction is written into the plan, and actual spend on the ledger line is down against the baseline in the period being reported. That can happen in-year; it doesn't have to wait for next year's budget.

This also separates true reductions from cost avoidance, which prevents future increases but doesn't lower the budget. The arithmetic of run-rate savings, in-year savings and avoidance is covered in why transformation numbers don't reconcile. The rules for finance sign-off are in getting a benefits register through finance.

Which controls stop backfill and substitution?

We suggest pairing each mechanism with a control that a named person owns:

MechanismControlSignal to watch
BackfillPosition control: removed positions are closed, and new ones need approval against the takeoutNew positions in scope units, by grade
SubstitutionTotal workforce view: employees, contractors, temps and consultants counted togetherContingent spend and headcount in scope units
ShiftingChanges to allocation rules and cross-charges reviewed by financeCost growth in adjacent cost centers
DeferralDeferred items listed at the start, with expected return datesMaintenance and renewal spend against that list
Volume reboundVolume drivers in the baselineUnit cost, not just total cost

The NAO's warning about bypassing recruitment controls is the case for the second row: a headcount cap on employees alone pushes work to whatever is not capped. If a program shifts spend between operating and capital budgets, have the controller confirm the treatment; this is not accounting advice.

What does a 24-month tracker look like?

All numbers below are illustrative. Take a shared-services takeout that removes 90 roles at a fully loaded $100,000 each ($9.0 million) and $3.0 million of third-party spend, for a claimed $12.0 million annual run-rate reduction.

Annual run-rate, $MMonth 6Month 12Month 18Month 24
Gross cost removed8.012.012.012.0
Backfilled roles(0.1)(0.5)(1.0)(1.5)
Contractor substitution(0.3)(0.9)(1.4)(1.8)
Shifted to other cost centers0.0(0.3)(0.5)(0.7)
Deferred spend returning0.0(0.1)(0.3)(0.6)
Net reduction7.610.28.87.4
Net as share of claim63%85%73%62%

At month 12 the program looks 85% delivered, which is when a program might be closed and its team disbanded. By month 24, 15 backfilled roles, 10 contractors at $180,000 each, $0.7 million shifted to other cost centers and $0.6 million of returning deferred spend have taken back $4.6 million, and only 62% of the claim remains. In the example, about 60% of the leakage arrives after month 12. We think that pattern is common, because backfill and contractor spend build up as controls relax, and it is why a 12-month window can overstate what sticks.

We suggest reconciling the tracker to the ledger every quarter for 24 months, with finance signing each net figure, and stopping only after two annual budgets have been set at the lower level.

Who should own the number after the program ends?

In our view, the budget holder. A transformation office can run the tracker, but it may disband before leakage shows up. GAO's May 2026 report on DOD civilian workforce reductions found the department had no plan to assess lessons learned from its 2025 reduction efforts, and recommended one, which DOD accepted. We think a private company should ask the same question of itself: who will look at this cost base again in 18 months?

In our view, savings stick when the baseline, the budget, the positions and the contractor spend sit in one operating model, so a backfill in one cost center shows up against the takeout that removed it.

Sources

Frequently asked questions

Why do cost savings disappear after a cost reduction program?

Usually because cost was moved rather than removed. Roles are backfilled, work returns as contractor or consulting spend, costs shift to other cost centers, and deferred maintenance comes due. The UK National Audit Office found departments' annual spending on consultants and temporary staff rose by £400 million to £600 million after 2011-12, while permanent workforces were being reduced.

How long should cost takeout savings be tracked?

We suggest 24 months, reconciled quarterly to the ledger, and until two annual budgets have been set at the lower level. In our illustrative tracker, the program looked 85% delivered at month 12 but only 62% at month 24, as backfill, contractor substitution, shifted costs and deferred spend returned. About 60% of that leakage appears after month 12, so a 12-month window would miss most of it.

What should a cost takeout baseline include?

In our view, the whole addressable cost base for the units in scope: employees, contractors, temporary staff, consultants, outsourced services, software and cross-charges, plus headcount and approved positions. Fix it on a full year of actuals, list one-offs and agree volume drivers up front. GAO reported that DOD's own assessment called $5.3 billion of headquarters savings "not auditable," partly because the baseline for reductions had not been established.

Does downsizing improve company performance?

The evidence is mixed and depends on how it is done. Cascio, Young and Morris (1997) found S&P 500 firms that only cut employees did not outperform industry peers, while those that also restructured assets did. Love and Nohria (2005) found broad downsizing with organizational redesign more likely to help than narrow personnel cuts. Guthrie and Datta (2008) linked downsizing to lower later profitability.

Free playbook

Map how your company really operates.

Read the discovery playbook
Steve Elliott

Steve Elliott

Published November 24, 2026

More on Transformation & Value

Value levers, benefits realization.