04 / The Model Underneath
What is the business case for changing an operating model?
Costs now, returns over years
The business case for changing an operating model rests on 4 kinds of benefit: cost removed by ending duplication, growth the old model could not deliver, speed in decisions and launches, and reduced risk. Against those sit one-time design and transition costs, ongoing costs of new roles, and a temporary loss of productivity. An honest case usually shows a loss in the first year and a return over 2 to 4. If yours shows a quick payback, check what you left out.
Operating model work is an investment in the company's ability to execute. It should be justified like one, with costs up front and returns that take time.
Start with the cost of doing nothing
The strongest argument is rarely the benefit of the new model. It is what the current one is costing.
| Symptom | What it costs | How to estimate it |
|---|---|---|
| The same capability built several times | Duplicate systems, teams, and contracts | Count the duplicates and price them |
| Strategy that is agreed and not delivered | Revenue or savings in the plan that do not arrive | Compare the strategic plan with actual results |
| Slow decisions | Delayed launches and missed windows | Time from proposal to decision, for recent major decisions |
| Budgets that do not follow priorities | Money spent on work that no longer matters | Share of spend not tied to a current priority |
If you cannot find a cost under any of these, you may not need a redesign. That is a legitimate conclusion.
The 4 kinds of benefit
| Benefit | Example | How hard to prove |
|---|---|---|
| Cost removed | 3 billing systems become one | Straightforward. It shows in the ledger |
| Growth enabled | A customer segment the old model could not serve well | Hard. The operating model enables it, and sales and product still have to win it |
| Speed | Launches in 6 months instead of 18 | Measurable in time. Harder to price |
| Risk reduced | Clear accountability, fewer things falling between teams | Real, and rarely quantifiable |
Build the financial case on the first row and a conservative share of the second. Present the third and fourth as measured outcomes without a dollar figure. A case that assigns a precise value to "faster decisions" invites the reviewer to distrust everything else.
The attribution problem
Growth is the largest benefit and the most contested. If revenue rises after a redesign, how much was the operating model and how much was the market, the sales team, or the product?
There is no exact answer. 2 rules keep the case credible.
- Count only growth the old model was blocking. Not growth that would have come anyway.
- Claim a share, and say what the share is. Attributing half to the operating model, and stating that openly, is more persuasive than claiming all of it.
The costs people leave out
| Cost | What it is | Why it gets missed |
|---|---|---|
| Design | The team and any outside help | Usually counted |
| Transition | Running the change: program team, system changes, hiring, in some cases severance | Partly counted. System work is often underestimated |
| New ongoing roles | Leaders and specialists the new model needs | Often treated as free |
| Disruption | Lost productivity while people learn new ways of working | Almost never counted |
| Leadership attention | Executive time not spent on customers and products | Never counted, and real |
Put a number on disruption even if it is rough. A redesign that assumes no dip in productivity is not a plan anyone has run before.
A worked example
Halden Freight is the fictional logistics company used across these guides. It is adding an Enterprise Accounts unit and shared product teams so it can serve national customers. All figures are illustrative.
Costs
| Cost | Year 1 | Year 2 | Year 3 |
|---|---|---|---|
| Billing consolidation | $2.8M | ||
| Design and transition team | $1.2M | ||
| Hiring product managers | $0.5M | ||
| Disruption allowance | $0.8M | ||
| New ongoing roles | $0.9M | $0.9M | $0.9M |
| Total | $6.2M | $0.9M | $0.9M |
Benefits
| Benefit | Year 1 | Year 2 | Year 3 |
|---|---|---|---|
| Billing run cost saved, from retiring 2 of 3 setups | $0.5M | $1.9M | $1.9M |
| Enterprise growth, at a 50% share | $0.5M | $2.0M | $3.6M |
| Total | $1.0M | $3.9M | $5.5M |
The billing saving starts in the fourth quarter of year 1, once the old systems are retired. The enterprise figure is half of the expected margin from new national accounts: $1.0 million, $4.0 million, and $7.2 million across the 3 years.
The result
| Year 1 | Year 2 | Year 3 | |
|---|---|---|---|
| Net benefit | −$5.2M | +$3.0M | +$4.6M |
| Cumulative | −$5.2M | −$2.2M | +$2.4M |
The redesign loses $5.2 million in its first year and pays back during year 3. That is a normal shape for operating model work. The costs are immediate and certain. The benefits build.
The pessimistic case. Suppose enterprise growth comes in at half the plan and the billing consolidation runs 2 quarters late.
| Year 1 | Year 2 | Year 3 | |
|---|---|---|---|
| Net benefit | −$6.0M | +$1.5M | +$2.8M |
| Cumulative | −$6.0M | −$4.4M | −$1.6M |
Now it has not paid back after 3 years, and breaks even in year 4. Halden's board saw both tables. It approved the redesign because the strategy depended on enterprise accounts either way, and the current model could not serve them at all. The financial case made the cost and timing clear. The strategic case made the decision.
What was not priced. Launching a new service in under 6 months, and decisions that are made once instead of 3 times. Both were design criteria and both are being measured. Neither was given a dollar value.
How to build your own
- State the strategic need. What does the strategy require that the current model cannot deliver?
- Price the cost of doing nothing. Duplication, undelivered plans, delays.
- Count hard savings in full and growth at a stated share.
- Include every cost, with an allowance for disruption.
- Show 3 years, with a pessimistic case.
- Set measures for the benefits you did not price, and commit to reporting them.
- Stage the investment. Ask for funding for the first slice, with the rest released on evidence.
Step 7 is how to get a cautious board to yes. A pilot with one customer group costs a fraction of the whole and proves or disproves the design.
Presenting it to a board
| Section | What to show |
|---|---|
| The need | What the strategy requires, and why the current model cannot deliver it |
| The cost of doing nothing | In money and in missed strategy |
| The change | Today and target, in one table |
| The economics | 3 years, base and pessimistic |
| What is not priced | The outcomes you will measure instead |
| The staging | What the first slice costs, and what would stop the program |
| The ask | Funding, and the board's support for the decisions that redistribute authority |
What not to promise
- Payback in a year. Rare, unless the redesign is mostly cost removal.
- Headcount savings as the main benefit. That is a cost program, and calling it an operating model redesign damages trust in the next one.
- That structure alone will deliver it. The benefits come from changed funding and decisions. See why operating model redesigns fail.
- Precision. The growth figures are estimates with wide ranges. Say so.
Questions leaders ask
What are the benefits of changing an operating model?
Lower cost from removing duplication, growth the previous model could not support, faster decisions and launches, and clearer accountability with less risk.
How do you build a business case for an operating model redesign?
Start from what the strategy requires, price the cost of the current model, count hard savings and a conservative share of enabled growth, include all costs with an allowance for disruption, and show 3 years with a pessimistic case.
How long does an operating model redesign take to pay back?
Often 2 to 4 years. Costs are incurred early and are certain, while benefits build over time. Redesigns focused on cost removal can pay back sooner.
What does an operating model redesign cost?
The main costs are design, transition work including system changes, new ongoing roles, and a temporary loss of productivity. System consolidation is frequently the largest single item.
How do you measure the ROI of an operating model?
Compare realized savings and a stated share of enabled growth with the full cost of the change, and separately track non-financial outcomes such as time to launch and time to decide.
Last reviewed 2026-11-26