04 / The Model Underneath

What is a target operating model?

The future state, and the path to it


A target operating model, or TOM, is a description of how a company intends to operate in the future in order to deliver its strategy, together with the path from how it operates today. It covers how work will flow, who will own and decide what, how money will be allocated, and what systems and skills will be needed. A current operating model describes what is. A target operating model describes what should be, and how to get from one to the other.

The second half of that definition is the part most often missing. A future state with no transition plan is a wish.

Operating model, current state, and target

3 terms get used interchangeably. They are different things.

TermWhat it isWhen you produce it
Operating modelHow a company is set up to deliver its strategy. Every company has oneIt exists whether or not it is written down
Current operating modelA description of how the company actually runs todayAt the start of any redesign
Target operating modelThe designed future state, and the path to itWhen strategy requires the company to run differently

More on the first in what is an operating model.

When you need a target operating model

Not every change needs one. A TOM is worth the effort when the way the company runs has to change in several connected ways at once. The usual triggers:

TriggerWhy the operating model has to change
A new strategyThe company needs to be good at something its current setup makes hard
A merger or acquisition2 operating models have to become one, or be deliberately kept apart
A new business line or marketThe existing model was built around a different customer
A cost transformationSavings at scale require changing how work is organized, not just trimming budgets
New regulationAccountability and controls have to be restructured
Adopting AI at scaleWork, decision rights, and roles shift when software starts doing tasks people did

If only one component needs to change, such as a planning cadence or a single team's scope, change that component. You do not need a TOM to fix a meeting.

What a target operating model contains

A complete TOM has 6 parts.

PartWhat it answers
1. Design criteriaWhat must the operating model make easy? 3 to 5 things, taken from the strategy
2. Current stateHow does the company run today, across the 7 components?
3. GapsWhere does today's model block each design criterion?
4. Target stateHow will each component work in the future?
5. Transition planIn what order will things change, and what goes first?
6. MeasuresHow will we know the new model is working?

Most documents called a TOM contain part 4 and little else. Parts 1 and 3 are what make the target defensible. Part 5 is what makes it real.

The 7 components, today and target

Halden Freight is the fictional logistics company used across these guides. Its strategy is to win national enterprise accounts while keeping its regional business profitable. Here is its target operating model, component by component.

ComponentTodayTargetChange needed
Value delivery3 regionsRegions for operations, plus Enterprise Accounts for national customersCreate the Enterprise Accounts unit
StructureCentral technology functionShared product teams for Tracking and BillingForm 2 product teams
Decision rightsRegions set all pricingEnterprise Accounts sets national pricing. Regions set regional pricingRewrite pricing authority
FundingAnnual projects by regionProduct teams funded as standing teams, reviewed quarterlyChange the budget process
Technology and data3 billing setupsOne billing platformConsolidate over 2 quarters
CadenceAnnual plan, monthly regional reviewsQuarterly cross-unit planningAdd the quarterly forum
People and skillsLittle product managementProduct managers for Tracking and BillingHire or develop

Notice what did not change. Regional operations stay exactly as they are, because they are not what blocks the strategy. A good TOM is as clear about what it leaves alone as about what it changes.

The method that produced this table is in how to design an operating model.

How much detail a TOM needs

A TOM is built in 3 levels. Most of the value is in the first 2, and many efforts fail by jumping to the third.

LevelWhat it containsWho it is forTypical length
1. BlueprintDesign criteria, the organizing choice, and each component in a sentence or twoThe executive team1 to 5 pages
2. DesignUnits and their scope, decision rights for recurring decisions, funding flows, forums, key rolesLeaders who will run the new modelTens of pages
3. Detailed designIndividual roles, processes, system changes, headcountTeams implementing each changeAs long as it needs to be

Agree level 1 before starting level 2. An executive team that has not agreed on the organizing choice will reopen it every time a detailed decision is uncomfortable.

Level 3 should be done in slices, as each part of the transition comes up. Designing every role for the whole company before changing anything takes a year, and the business will have moved by the time it is finished.

The transition plan

The transition is where target operating models succeed or fail. 3 principles:

  • Change funding and decision rights early. They change behavior faster than reporting lines do.
  • Move in slices. Run the new model for one customer group, product, or region before the whole company depends on it.
  • Sequence by dependency. Some changes cannot work until others are in place. A product team cannot own a platform before its funding is settled.

Halden's sequence:

WhenWhat changes
Quarter 1The Billing product team is formed with standing funding. National pricing rights move to a small Enterprise Accounts team
Quarter 2Quarterly planning begins across all units. 5 enterprise customers move to the new model
Quarters 3 and 4Remaining enterprise customers migrate. The 3 billing setups are consolidated

5 ways target operating models go wrong

  • It is a structure chart. The TOM shows boxes and reporting lines, and says nothing about decisions, funding, or cadence. Behavior does not change.
  • It has no design criteria. Without them, every choice is a matter of opinion and the most senior opinion wins.
  • It is too detailed, too early. Hundreds of pages of role descriptions before the organizing choice is agreed.
  • It has no transition. The target is clear and nobody knows what happens on Monday.
  • It is treated as finished. A TOM is a direction. The business will change during the transition, and the target should be revisited at each stage.

How long a TOM lasts

A target operating model is tied to a strategy. When the strategy changes materially, the target should be reviewed. In practice, a TOM guides 2 to 3 years of change, with adjustments along the way. One that has not been looked at in 3 years is describing a company that no longer exists.

This is the weakness of a TOM that lives in a document. It is accurate on the day it is signed off and drifts from then on. Keeping the model connected to how the company actually runs is the idea behind an Enterprise Operating Model.

Questions leaders ask

What is a target operating model?

A target operating model is a description of how an organization intends to operate in the future to deliver its strategy, along with the plan for moving there from its current way of operating.

What does TOM stand for?

TOM stands for target operating model.

What should a target operating model include?

Design criteria from the strategy, a description of the current state, the gaps, the target state for each component of the operating model, a transition plan, and measures of success.

What is the difference between an operating model and a target operating model?

An operating model is how a company runs. A target operating model is the designed future version of it, with the path to get there.

How long does it take to develop a target operating model?

The blueprint and design levels typically take 3 to 4 months for a mid-size company. Implementation is staged over a year or more.

Who is responsible for the target operating model?

The executive team owns the design criteria and the main organizing choice. A transformation office, chief operating officer, or chief of staff usually runs the work.

Last reviewed 2026-11-26