02 / Fund & Optimize

How do you handle facilities costs in TBM?

Count what stops being paid, not what was allocated


In TBM, facilities costs are the physical space, power, and cooling that technology runs in. They sit in the Data Center Facilities cost pool and the Data Center tower, and are allocated to the infrastructure that occupies the space, usually by rack or by power drawn. They are a small share of most technology budgets and a large source of error in cloud migration business cases, because they do not fall when a workload leaves. They fall only when space is actually given up.

What counts as a facilities cost

In the Data Center Facilities poolNot in it
Owned or leased data center spaceThe servers, storage, and network gear inside. Those are Hardware
Colocation feesThe people who run the facility. Those are Staffing
Power for the data centerCloud provider charges. Those are Cloud Services
Cooling and environmental controlsOffice space for technology staff, which usually arrives as a Cross Charge
Physical security and fire suppression for the facilityNetwork circuits into the facility. Those are Telecom

Keeping people and hardware out of the pool matters. It lets you see what the building itself costs, separately from what is in it.

Halden's facilities costs

Halden Freight is the fictional logistics company used across this guide. It runs 2 data centers, one in a colocation facility and one in a building it owns, holding 180 racks between them.

CostAnnualShareFixed or variable
Space: colocation fees and owned building costs$1.3M43%Fixed until a contract ends or space is released
Power$1.1M37%Varies with what is running
Cooling and environmental$0.4M13%Partly varies with load
Physical security and other$0.2M7%Fixed
Total$3.0M100%

That is 4% of an $84.0 million budget. On its own it would not deserve a page. It deserves one because of what happens when you move workloads out.

Allocating facilities to what uses them

Facilities costs are allocated to the infrastructure in the building, and from there to the solutions that infrastructure supports.

DriverHow it worksBest for
By rackTotal cost divided by racks, charged per rack occupiedSimple, and good enough for most
By power drawnCost split by kilowatts each rack or system consumesFacilities where power density varies a lot, such as those with AI hardware
By floor spaceCost split by square feetOlder facilities with mixed equipment
Two-partSpace by rack, power by kilowattsThe most accurate, at more effort

At 180 racks, Halden's cost per rack is $16,667 a year. Of that, about $6,100 is power and $7,200 is space.

Power density is becoming a real issue. A rack of AI hardware can draw several times the power of a conventional one. Allocating by rack would spread that cost onto everyone else. If you host AI hardware yourself, allocate power by kilowatts.

The stranded cost trap

Here is the mistake that appears in most migration business cases.

Halden plans to move the last on-premises part of Shipment Tracking to the cloud. It occupies 20 racks. The model allocates $333,000 a year of facilities cost to those racks. The business case claims that as a saving.

It is not one. Look at what actually stops being spent.

CostAllocated to the 20 racksActually saved in year oneWhy
Power$122,000$122,000The equipment is switched off
Space$144,000$0The colocation contract runs another 14 months, and the cage stays the same size
Cooling, security, other$67,000Little or noneMostly fixed for the facility
Total$333,000About $122,000

The allocated cost is $333,000. The real saving is $122,000. The other $211,000 does not disappear. It is still paid, and the model now spreads it across the 160 racks that remain, raising their cost per rack from $16,667 to about $17,986.

Every service still in the data center just got more expensive, without anything about it changing. This is stranded cost.

How to handle stranded cost honestly

  • Separate allocated cost from avoidable cost in every business case. Allocated cost is what the model assigns. Avoidable cost is what stops being paid. Only the second is a saving.
  • Tie facilities savings to exit events. Space cost falls when a contract ends, a cage is downsized, or a building is closed. Put those dates in the plan.
  • Plan migrations to empty whole units. 20 racks scattered across a facility release nothing. 20 racks that empty a cage can be handed back.
  • Show stranded cost as its own line. When remaining tenants' costs rise because others left, say so. Otherwise service owners are blamed for an increase they did not cause.
  • Decide who carries it. Some organizations hold stranded facilities cost centrally during a migration rather than loading it onto the services left behind. That keeps unit costs comparable from year to year.

The same trap applies in reverse to cloud. Savings from switching something off in the cloud are immediate. Savings from leaving a data center arrive in steps, on dates set by contracts.

Comparing on-premises and cloud fairly

A comparison is only fair if both sides include everything.

On-premises costWhere it sits in the model
Space, power, coolingData Center Facilities pool
Servers, storage, network equipment, depreciatedHardware pool
Software for virtualization and managementSoftware & SaaS pool
The people who run itStaffing pool
Network circuitsTelecom pool

Most on-premises estimates include the first 2 and leave out the rest, which makes on-premises look cheaper than it is. Most cloud estimates use the provider's price and leave out the people still needed to run it, which makes cloud look cheaper than it is. The model's tower view corrects both, because Compute and Storage draw from every pool.

Facilities beyond the data center

Technology runs in other physical places too, and the costs are easy to miss.

LocationTechnology cost involvedWhere it goes
OfficesNetwork rooms, wiring, wirelessNetwork tower
Warehouses and depotsScanners, sensors, local networksSmart Devices and Network towers
Office space occupied by technology staffRent and utilities charged by corporate real estateCross Charges pool, then Tech Management

For Halden, a logistics company, depots matter. Its Smart Devices tower is $0.4 million, and closing or opening a depot changes technology cost. Its real estate and technology plans need to be read together.

Questions leaders ask

What are data center facilities costs in TBM?

The cost of the physical environment technology runs in: space, power, cooling, and environmental controls. In the TBM Taxonomy they are the Data Center Facilities cost pool and feed the Data Center tower.

How do you allocate data center costs?

Most commonly per rack, or by power consumed in kilowatts. A two-part method, space by rack and power by kilowatts, is more accurate where power density varies.

What is stranded cost in a cloud migration?

Stranded cost is fixed cost, such as data center space, that continues after a workload moves out. It is reallocated to whatever remains until the space is actually released.

Does moving to the cloud save data center costs?

Power savings are immediate. Space savings arrive only when a contract ends or a facility is downsized or closed. A business case should count avoidable cost, not allocated cost.

How do you compare cloud and on-premises costs?

Include everything on both sides: facilities, hardware, software, people, and network for on-premises, and provider charges plus the people who manage it for cloud.

Last reviewed 2026-11-26