How do you handle facilities costs in TBM?
Count what stops being paid, not what was allocated
In TBM, facilities costs are the physical space, power, and cooling that technology runs in. They sit in the Data Center Facilities cost pool and the Data Center tower, and are allocated to the infrastructure that occupies the space, usually by rack or by power drawn. They are a small share of most technology budgets and a large source of error in cloud migration business cases, because they do not fall when a workload leaves. They fall only when space is actually given up.
What counts as a facilities cost
| In the Data Center Facilities pool | Not in it |
|---|---|
| Owned or leased data center space | The servers, storage, and network gear inside. Those are Hardware |
| Colocation fees | The people who run the facility. Those are Staffing |
| Power for the data center | Cloud provider charges. Those are Cloud Services |
| Cooling and environmental controls | Office space for technology staff, which usually arrives as a Cross Charge |
| Physical security and fire suppression for the facility | Network circuits into the facility. Those are Telecom |
Keeping people and hardware out of the pool matters. It lets you see what the building itself costs, separately from what is in it.
Halden's facilities costs
Halden Freight is the fictional logistics company used across this guide. It runs 2 data centers, one in a colocation facility and one in a building it owns, holding 180 racks between them.
| Cost | Annual | Share | Fixed or variable |
|---|---|---|---|
| Space: colocation fees and owned building costs | $1.3M | 43% | Fixed until a contract ends or space is released |
| Power | $1.1M | 37% | Varies with what is running |
| Cooling and environmental | $0.4M | 13% | Partly varies with load |
| Physical security and other | $0.2M | 7% | Fixed |
| Total | $3.0M | 100% |
That is 4% of an $84.0 million budget. On its own it would not deserve a page. It deserves one because of what happens when you move workloads out.
Allocating facilities to what uses them
Facilities costs are allocated to the infrastructure in the building, and from there to the solutions that infrastructure supports.
| Driver | How it works | Best for |
|---|---|---|
| By rack | Total cost divided by racks, charged per rack occupied | Simple, and good enough for most |
| By power drawn | Cost split by kilowatts each rack or system consumes | Facilities where power density varies a lot, such as those with AI hardware |
| By floor space | Cost split by square feet | Older facilities with mixed equipment |
| Two-part | Space by rack, power by kilowatts | The most accurate, at more effort |
At 180 racks, Halden's cost per rack is $16,667 a year. Of that, about $6,100 is power and $7,200 is space.
Power density is becoming a real issue. A rack of AI hardware can draw several times the power of a conventional one. Allocating by rack would spread that cost onto everyone else. If you host AI hardware yourself, allocate power by kilowatts.
The stranded cost trap
Here is the mistake that appears in most migration business cases.
Halden plans to move the last on-premises part of Shipment Tracking to the cloud. It occupies 20 racks. The model allocates $333,000 a year of facilities cost to those racks. The business case claims that as a saving.
It is not one. Look at what actually stops being spent.
| Cost | Allocated to the 20 racks | Actually saved in year one | Why |
|---|---|---|---|
| Power | $122,000 | $122,000 | The equipment is switched off |
| Space | $144,000 | $0 | The colocation contract runs another 14 months, and the cage stays the same size |
| Cooling, security, other | $67,000 | Little or none | Mostly fixed for the facility |
| Total | $333,000 | About $122,000 |
The allocated cost is $333,000. The real saving is $122,000. The other $211,000 does not disappear. It is still paid, and the model now spreads it across the 160 racks that remain, raising their cost per rack from $16,667 to about $17,986.
Every service still in the data center just got more expensive, without anything about it changing. This is stranded cost.
How to handle stranded cost honestly
- Separate allocated cost from avoidable cost in every business case. Allocated cost is what the model assigns. Avoidable cost is what stops being paid. Only the second is a saving.
- Tie facilities savings to exit events. Space cost falls when a contract ends, a cage is downsized, or a building is closed. Put those dates in the plan.
- Plan migrations to empty whole units. 20 racks scattered across a facility release nothing. 20 racks that empty a cage can be handed back.
- Show stranded cost as its own line. When remaining tenants' costs rise because others left, say so. Otherwise service owners are blamed for an increase they did not cause.
- Decide who carries it. Some organizations hold stranded facilities cost centrally during a migration rather than loading it onto the services left behind. That keeps unit costs comparable from year to year.
The same trap applies in reverse to cloud. Savings from switching something off in the cloud are immediate. Savings from leaving a data center arrive in steps, on dates set by contracts.
Comparing on-premises and cloud fairly
A comparison is only fair if both sides include everything.
| On-premises cost | Where it sits in the model |
|---|---|
| Space, power, cooling | Data Center Facilities pool |
| Servers, storage, network equipment, depreciated | Hardware pool |
| Software for virtualization and management | Software & SaaS pool |
| The people who run it | Staffing pool |
| Network circuits | Telecom pool |
Most on-premises estimates include the first 2 and leave out the rest, which makes on-premises look cheaper than it is. Most cloud estimates use the provider's price and leave out the people still needed to run it, which makes cloud look cheaper than it is. The model's tower view corrects both, because Compute and Storage draw from every pool.
Facilities beyond the data center
Technology runs in other physical places too, and the costs are easy to miss.
| Location | Technology cost involved | Where it goes |
|---|---|---|
| Offices | Network rooms, wiring, wireless | Network tower |
| Warehouses and depots | Scanners, sensors, local networks | Smart Devices and Network towers |
| Office space occupied by technology staff | Rent and utilities charged by corporate real estate | Cross Charges pool, then Tech Management |
For Halden, a logistics company, depots matter. Its Smart Devices tower is $0.4 million, and closing or opening a depot changes technology cost. Its real estate and technology plans need to be read together.
Questions leaders ask
What are data center facilities costs in TBM?
The cost of the physical environment technology runs in: space, power, cooling, and environmental controls. In the TBM Taxonomy they are the Data Center Facilities cost pool and feed the Data Center tower.
How do you allocate data center costs?
Most commonly per rack, or by power consumed in kilowatts. A two-part method, space by rack and power by kilowatts, is more accurate where power density varies.
What is stranded cost in a cloud migration?
Stranded cost is fixed cost, such as data center space, that continues after a workload moves out. It is reallocated to whatever remains until the space is actually released.
Does moving to the cloud save data center costs?
Power savings are immediate. Space savings arrive only when a contract ends or a facility is downsized or closed. A business case should count avoidable cost, not allocated cost.
How do you compare cloud and on-premises costs?
Include everything on both sides: facilities, hardware, software, people, and network for on-premises, and provider charges plus the people who manage it for cloud.